Specifications of Asbestos Abatement

BDN determines the specifics of an asbestos abatement management plan for clients.

The asbestos management plan will be used to determine the location and quantity of materials that need to be abated because they pose a risk to human health and safety. The material assessments include:

  • Degree of damage to material
  • Friability
  • Accessibility by building occupants and maintenance personnel
  • Proximity to air stream
  • Vibration and water damage will be used to prioritize abatement

A written specification will be developed that explains the extent of the work and how it should be performed.

 









Corporate Office
Valleywood Lane
Portage, Michigan
49024


Call Toll-Free
(800) 968-0123